Cisco DPC 3925 Betriebsanweisung Seite 99

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 106
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 98
4021192 Rev B
Front Panel LED Status Indicator Functions
Front Panel LED Status Indicator Functions
Initial Power Up, Calibration, and Registration (AC Power applied)
The following chart illustrates the sequence of steps and the corresponding
appearance of the residential gateway front panel LED status indicators during
power up, calibration, and registration on the network when AC power is applied to
the residential gateway. Use this chart to troubleshoot the power up, calibration, and
registration process of your residential gateway.
Note: After the residential gateway completes Step 11 (Telephone Registration
Complete), the modem proceeds immediately to Normal Operations. See Normal
Operations (AC Power applied) (on page 101).
Front Panel LED Status Indicators During Initial Power Up, Calibration, and Registration
Part 1, High Speed Data Registration
Step:
1
2
3
4
5
6
Front Panel Indicator
Self
Test
Downstream
Scan
Downstream
Signal Lock
Ranging
Requesting IP
Address
Request High
Speed Data
Provisioning File
1
POWER
On
On
On
On
On
On
2
DS
On
Blinking
On
On
On
On
3
US
On
Off
Off
Blinking
On
On
4
ONLINE
On
Off
Off
Off
Off
Blinking
5
ETHERNET
1-4
On
On or
Blinking
On or
Blinking
On or
Blinking
On or Blinking
On or Blinking
6
USB
On
On or
Blinking
On or
Blinking
On or
Blinking
On or Blinking
On or Blinking
7
WIRELESS
LINK
Off
On or
Blinking
On or
Blinking
On or
Blinking
On or Blinking
On or Blinking
8
WIRELESS
SETUP
Off
On or
Blinking
On or
Blinking
On or
Blinking
On or Blinking
On or Blinking
9
TEL 1
On
Off
Off
Off
Off
Off
10
TEL 2
On
Off
Off
Off
Off
Off
Seitenansicht 98
1 2 ... 94 95 96 97 98 99 100 101 102 103 104 105 106

Kommentare zu diesen Handbüchern

Keine Kommentare