Cisco UBR7223 - uBR 7223 Modular Expansion Base Spezifikationen Seite 38

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 72
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 37
Installation Overview
PA-H HSSI Port Adapter Installation and Configuration
4-6
Figure 4-5 Port Adapter Installed in a Port Adapter SlotPartial Port Adapter View
Step 11
Replace the screw in the rear of the port adapter slot. (See Figure 4-2 for its location.) Do
not overtighten this screw.
Step 12 Reinstall the Catalyst RSM/VIP2 in the system. Follow the steps in the Route Switch
Module Catalyst VIP2-15 and VIP2-40 Installation and Configuration Note (Document
Number 78-4780-01) which shipped with your Catalyst RSM/VIP2.
Step 13 If disconnected, reconnect the interface cables to the port adapters.
This completes the procedure for installing a new port adapter or replacing a port adapter on a
Catalyst RSM/VIP2. To install the necessary cables and configure your PA-H, proceed to Chapter 8,
“Cable Installation and Interface Configuration.
H3152
Seitenansicht 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 71 72

Kommentare zu diesen Handbüchern

Keine Kommentare