Cisco CX-FEIP-1TX= Installation and con?guration Betriebsanweisung Seite 412

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 648
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 411
Preparing network connections (1+1 Hot Standby) Chapter 5: Installation
5-90
phn-2513_004v000 (Oct 2012)
Installing an out-of-band protection splitter
If a 1+1 protected configuration requires an out-of-band protection splitter, connect the
CMU Management ports to the management network as shown in Figure 105.
Use straight-through Cat5e cables with a maximum length of 2 m to connect the CMUs to
the splitter.
At the edge of the network (the ‘last hop’), if no management network equipment is
available, the two LAN ports can be connected using a protection cable. The cable pin
outs are specified in Protection cable on page 4-17.
Figure 105 Out-of-band protection splitter connections
Seitenansicht 411
1 2 ... 407 408 409 410 411 412 413 414 415 416 417 ... 647 648

Kommentare zu diesen Handbüchern