Cisco AS2509-RJ Bedienungsanleitung Seite 9

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 26
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 8
Sun Technical Compute Farm Read Me First December 2000 9
Revised Cabling for the Repositioned Cisco
Devices
Schematic diagrams have been revised to show the new positioning of the Cisco
networking devices. The C3524 and C3508 Ethernet switches are now mounted
facing the rear of the rack.
FIGURE 5 replaces Figures 5-2, 5-11, 5-17, and 5-18 in the Sun Technical Compute Farm
Installation and Service Manual.
FIGURE 5 shows revised positioning and cabling for
the C3524 and C3508 switches in the base rack configuration.
FIGURE 6 shows revised positioning and cabling for the C3524 and C3508 switches in
the star rack configuration.
FIGURE 6 replaces Figure 5-22 in the Sun Technical
Compute Farm Installation and Service Manual.
Seitenansicht 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 25 26

Kommentare zu diesen Handbüchern

Keine Kommentare