Cisco 6509-NEB - Catalyst Switch Installationsanleitung Seite 21

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 28
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 20
21
Catalyst 6509-NEB Switch and Cisco OSR-7609 Router Upgrade Note
78-16162-02
Powering Up the System
Figure 17 Ejector Lever Closure in the Chassis
Powering Up the System
This section describes how to power up the system.
AC-Input Systems, page 21
DC-Input Systems, page 22
AC-Input Systems
To power up your AC-input system, follow these steps:
Step 1 Plug the power cord into the power supply, and tighten the screw on the cable retention device.
Step 2 Connect the other end of the power cord to an AC-input power source.
Caution In a system with dual power supplies, connect each power supply to a separate input source. In case of
a power source failure, the second source will most likely still be available.
Step 3 Turn the power switch to the On (|) position on the power supply. Switching the power switch to On also
engages a pawl that locks the power supply in the bay.
WS-C6500-NEB-FAN2
HIGH SPEED FAN
48V INPUT 1
RTN -48VDC GND
INPOUT POWER
GOOD
48V INPUT 2
RTN -48VDC GND
INPOUT POWER
GOOD
FAN FAIL
All ejector levers flush
with module faceplate
105094
Seitenansicht 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 27 28

Kommentare zu diesen Handbüchern

Keine Kommentare